Monday, January 10, 2011
Design speed per hour to be in line with for 250 kilometers
(Responsibility editor:Zhao Ting)
Win a luxuriant of new net to give or get an electric shock(reporter is beam is prosperous) the morning of the 31th on December 31, head trip goods railroad train from Guangdong luxuriant train the east stand to start and leave for a 岺 river direction in Guangxi, go to this, always invest about CNY 3,200,000,000, experience successively the Luo Zhan railroad 岺 river that 5 years constuct to is finished to be open to traffic to the luxuriant segment.
The Luo Zhan railroad Cen river goes to a luxuriant the segment begin to work construction in December, 2005 and all grow 151.83 kilometers, among them Guangxi inshore 29.6 kilometers, Guangdong inshore 122.23 kilometers, design speed per hour to be in line with for 250 kilometers, rising at the Cen river train station in Guangxi, getting into a luxuriant of Guangdong toward the south region, giving or getting an electric shock a white station in three luxuriant railroads for 140 kilometers, reserving an electrification condition speed per hour.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment